Direct Outdoor Thermal Enclosures · NEMA 250 / IEC 60529 IP55–IP65 · 15-Minute Formal Quote
MODEL CODE OD-24U-HYBSERIES Hybrid Modular UpgradeCATEGORY Hybrid Fan-to-AC Enclosure

OD-24U-HYB — 24U Hybrid Fan-to-AC Drop-In Swap Outdoor Network Enclosure

Built for phased WISP, smart-campus, and utility rollouts where initial equipment load is low but future PoE, fiber OLT, or edge-compute upgrades will demand active refrigeration.

Request 15-Minute Formal Quote WhatsApp +86 13392250172Email jacklau@outdoornetworkenclosure.com

Dual-Unit Technical Specifications (OD-24U-HYB)

ParameterEngineering SpecificationReference / Notes
External Dimensions (H × W × D)1400 × 750 × 750 mm (55.1 × 29.5 × 29.5 in)Identical pad footprint to OD-24U-AC600 for fleet standardization
Usable 19" Rack Envelope24U · 580 mm (22.8 in) usable depth4-post adjustable EIA-310-E rails; 400 kg (881 lb) static load
Stage 1 Cooling ModuleThermostatic dual EC roof/door exhaust fans + IP55 MERV-rated filter louversIdeal for temperate sites or initial < 300W switch loads
Stage 2 Drop-In AC Compatibility600 W (2,047 BTU/hr) to 1,500 W (5,118 BTU/hr) closed-loop AC cassetteUses identical 12-bolt M6 perimeter pattern + EPDM compression seal
Field Upgrade Time< 45 minutes with hand tools only — zero cutting, welding, or repaintingPreserves factory powder-coat corrosion warranty & IP55–IP65 seal
Double-Wall Solar Shield25 mm (1.0 in) ventilated air gap + 20 mm PEF insulationRAL 7035 UV-stabilized polyester exterior finish
Pre-Wired AC ReadinessDedicated spare DIN breaker slot + 110V/220V or 48V DC terminal blockOptional blanked roof exhaust cap included for Stage 2 closed-loop sealing
Battery CompartmentLower 6U isolated battery bay (200 kg / 440 lb shelf)Accommodates 48V LiFePO4 or VRLA backup strings
Standards AlignmentNEMA 250 / IEC 60529 IP55–IP65 & EIA-310-EBuilt to standard; thermal test sheets available per project

Target Applications & Operating Fit

  • Growing WISP operators starting with 150W–250W of microwave/fiber gear who plan to add high-power 5G/OLT blades within 1–3 years
  • Smart-city and university campuses deploying pilot cabinets on tight initial budgets without risking stranded hardware
  • Mild-climate utility deployments that may later relocate or upgrade to edge-AI vision appliances
  • Integrators standardizing on a single 24U concrete pad anchor pattern across both fan-cooled and AC-cooled sites

Structural & Standards Engineering

  • Laser-cut bolted door interface with captive stainless M6 studs lets a single field technician convert filtered fan cooling into closed-loop AC using only a socket wrench.
  • Zero field cutting eliminates bare steel edges, metal shavings inside live electronics, and compromised powder-coat corrosion zones.
  • Includes a solid gasketed roof blanking plate so when Stage 2 AC is installed, the Stage 1 roof fan opening seals hermetically for closed-loop operation.
  • Pre-wired spare DIN breaker and thermostat terminal strip minimize electrical rework during future AC commissioning.

5-Parameter Engineering Modification Scope

  • Ship with Stage 1 filtered-fan plate now and pre-reserve matching 600W, 1000W, or 1500W drop-in AC cassettes
  • 110V/60Hz, 220V/50–60Hz, or 48V DC internal power distribution pre-wiring
  • 400W winter PTC heater pre-installed on lower DIN rail for immediate cold-weather protection
  • Optional polycarbonate viewing window on inner security door or full blind solid door
  • Custom bottom gland layout and heavy-duty pole-mount adapter frame for light-duty installations

Technical FAQs

How does the OD-24U-HYB switch from open-loop fan cooling to sealed closed-loop AC?

In Stage 1, conditioned ambient air enters through the lower bolted filter louver plate and exits through the top fan tray. To upgrade to Stage 2, unbolt the lower louver plate, install the gasketed roof blanking cap over the top fan cutout, bolt the 600W–1500W AC cassette onto the same door studs, and land power on the pre-wired DIN terminal.

Do we have to take the cabinet off the pad or move live switches during the AC upgrade?

No. The entire swap happens on the exterior face of the front door and top canopy while 19-inch switches stay mounted and powered inside the rack.

Does the bolted adapter plate maintain IP55–IP65 weather sealing after conversion?

Yes. Both the Stage 1 cassette and Stage 2 AC module compress a continuous closed-cell EPDM perimeter gasket against an outward-formed drip flange around the door opening.

Can we order extra 600W or 1500W drop-in AC kits later as spare stock?

Yes. Every OD-24U-HYB uses our standardized modular bolt pattern so drop-in 600W, 1000W, or 1500W AC modules can be stocked and swapped across your entire fleet.

OD-12U-AC300

12U Pole/Pad Mount + 300W Micro-AC

Compact 12U double-wall solar-shielded cabinet pairing a 300W (1,024 BTU/hr) closed-loop compressor AC with heavy-duty pole/wall/pad brackets for WISP relays and campus fiber nodes.

View Datasheet →
OD-24U-AC600

24U Double-Wall + 600W AC

Balanced 24U pad-mount double-wall cabinet combining a 600W (2,047 BTU/hr) closed-loop air conditioner with a segregated lower 48V battery bay for WISP distribution hubs and roadside ITS.

View Datasheet →
OD-32U-AC2000

Flagship 32U Double-Wall + 2000W Industrial AC

Flagship 32U double-wall solar-shielded enclosure pairing a high-ambient 2000W (6,824 BTU/hr) closed-loop industrial AC with full-depth 19-inch rails for dense ITS, solar-BESS, and mining edge compute.

View Datasheet →